Imodco delivers Limetree Bay terminal
Published by Callum O'Reilly,
Senior Editor
Tanks and Terminals,
Following a fast-track engineering, procurement and construction (EPC) phase, Imodco ha announced that it has safely delivered the Limetree Bay terminal in-line with Limetree Bay LLC’s plan.
Johann Declercq, Imodco Managing Director, said: “This was a complex and challenging project with time-to-market driving it. We are delighted to have delivered it to the satisfaction of our client, and I am particularly proud of our team who achieved several world firsts […] What clinched the deal for us was our unrivaled capability to combine Imodco’s EPC know-how with the SBM Offshore Group installation vessel and expertise to deliver an integrated EPCI scope of work.”
Imodco designed, fabricated and supplied a customised large semi-taut system, pipeline-end manifold (PLEM) and umbilicals, a Trelline® flexible subsea line from buoy to PLEM at 41 m and driven anchor piles.
The in-house SBM installer vessel covered the complex mooring and installation operations and logistics, including the anchoring, drilling and installation of piles and grouting on a 20° slope.
Read the article online at: https://www.tanksterminals.com/storage-tanks/06022020/imodco-delivers-limetree-bay-terminal/
You might also like
Hydrocarbon Engineering Podcast
Peter Davidson, CEO of the Tank Storage Association (TSA), joins us to discuss the essential role that the tank storage sector has to play in ensuring supply security and resilience, as well as in facilitating the energy transition.
TotalEnergies signs an agreement to export 2 million tpy of LNG from the Ksi Lisims LNG Project
TotalEnergies has signed a sales and purchase agreement (SPA) with Ksi Lisims LNG for the purchase of 2 million tpy of LNG for 20 years from the future liquefaction plant, subject to the final investment decision of the project.