‘Tristar Ruby’ carrier arrives at Croatia LNG terminal
Published by Pippa Luck,
Editorial Assistant
Tanks and Terminals,
The first LNG carrier, ‘Tristar Ruby’, has arrived at the Croatia LNG terminal on the Island of KRK.
The LNG carrier was successfully moored in the special purpose port of the terminal.
After all tests and safety tests were performed, LNG cargo transfer procedure from the LNG carrier to the floating storage and regasification unit (FSRU) vessel ‘LNG CROATIA’ was started.
According to LNG Croatia, this activity marks the start of terminal commercial operation, in accordance with the planned deadlines.
Read the article online at: https://www.tanksterminals.com/terminals/07012021/tristar-ruby-carrier-arrives-at-croatia-lng-terminal/
You might also like
Hydrocarbon Engineering Podcast
Peter Davidson, CEO of the Tank Storage Association (TSA), joins us to discuss the essential role that the tank storage sector has to play in ensuring supply security and resilience, as well as in facilitating the energy transition.
Centrica and PTT have signed a HOA for a long-term LNG supply deal
Under the Heads of Agreement (HOA), PTT will supply LNG to Centrica for a 10 year period across a range of destinations in Asia, with deliveries expected to begin in 2028.