GTT receives order for the tank design of four LNG carriers
Published by Alex Hithersay,
Editorial Assistant
Tanks and Terminals,
Gaztransport & Technigaz (GTT) has received an order from the Korean shipyard Hyundai Heavy Industries (HHI) concerning the tank design of four new LNG carriers.
The carriers will be built on behalf of the Greek ship-owner Capital Gas Carriers.
GTT's Mark III Flex technology has been selected to equip the LNG tanks of the four 174 000 m3 ships. The delivery of these vessels is scheduled between the end of 2020 and mid-2021.
Read the article online at: https://www.tanksterminals.com/storage-tanks/10092018/gtt-receives-order-for-the-tank-design-of-four-lng-carriers/
You might also like
CMP has fully phased in fossil-free fuel at its container terminal in Copenhagen
Since November 2023, CMP has been gradually phasing in the renewable fossil-free fuel hydrogenated vegetable oil (HVO100) at the container terminal in Copenhagen, Denmark.