GTT receives order for the tank design of four LNG carriers
Published by Alex Hithersay,
Editorial Assistant
Tanks and Terminals,
Gaztransport & Technigaz (GTT) has received an order from the Korean shipyard Hyundai Heavy Industries (HHI) concerning the tank design of four new LNG carriers.
The carriers will be built on behalf of the Greek ship-owner Capital Gas Carriers.
GTT's Mark III Flex technology has been selected to equip the LNG tanks of the four 174 000 m3 ships. The delivery of these vessels is scheduled between the end of 2020 and mid-2021.
Read the article online at: https://www.tanksterminals.com/storage-tanks/10092018/gtt-receives-order-for-the-tank-design-of-four-lng-carriers/
You might also like
Hydrocarbon Engineering Podcast
Peter Davidson, CEO of the Tank Storage Association (TSA), joins us to discuss the essential role that the tank storage sector has to play in ensuring supply security and resilience, as well as in facilitating the energy transition.
US natural gas storage capacity increased in 2024
Underground working natural gas storage capacity in the Lower 48 states increased in 2024 according to our latest data.