Skip to main content

33% more berths at Vopak terminal

Published by
Tanks and Terminals,


Vopak and the Port of Amsterdam jointly invest in additional vessel handling infrastructure at Vopak Terminal Amsterdam Westpoort. One jetty will be extended with one berth for seagoing vessels, and a new quay wall with two berths for barges will be built, bringing the total number of berths to four for seagoing vessels and 10 for barges by the end of 2018. Pumping capacity at the terminal will also be increased.

Ramon Ernst, Managing Director Vopak Terminal Amsterdam Westpoort, “The high throughput volumes at our state-of the-art terminal can occasionally result in queues for vessels and barges. This investment will increase the vessel handling capabilities at our terminal and thereby – together with the new sea lock – improve the overall service and efficiency in the port of Amsterdam. Vopak’s strategy in the ARA region is to invest in productivity and service improvements at our current terminals instead of adding storage capacity for which we don’t see a need.” Koen Overtoom, CEO Port of Amsterdam; ”This joint investment underlines the importance of liquid bulk for our port and our clients and also shows our strategy to challenge the business to use the space more efficiently and increase activity per square metre.”

In line with the modern operating philosophy of Vopak Terminal Amsterdam Westpoort, the new infrastructure will be highly automated and fully connected to the vapour recovery unit.

Read the article online at: https://www.tanksterminals.com/storage-tanks/06032017/33-more-berths-at-vopak-terminal/

You might also like

Catalysts 2019

Catalysts 2019

Catalysts 2019 is an online conference for professionals in the downstream sector. Since this is a completely virtual conference, you can join us from anywhere in the world, absolutely free. Register for free today »

 
 
 

Embed article link: (copy the HTML code below):