Phase 2 concludes on HES International’s Botlek terminal
Published by Alex Hithersay,
Editorial Assistant
Tanks and Terminals,
HES International has announced the completion of Phase 2 on its Botlek tank terminal.
Although the tanks were already operational, they still needed to be painted. With the completion of this paintwork, Phase 2 is officially concluded.
The current capacity of 490 000 m3 will however soon be expanded as the next project begins.
This expansion consists of six tanks for biofuels with a total capacity of 20 000 m3.
Read the article online at: https://www.tanksterminals.com/terminals/26112018/phase-2-concludes-on-hes-internationals-botlek-terminal/
You might also like
Hydrocarbon Engineering Podcast
Peter Davidson, CEO of the Tank Storage Association (TSA), joins us to discuss the essential role that the tank storage sector has to play in ensuring supply security and resilience, as well as in facilitating the energy transition.
ABB extends automation and electrical scope for Rio Grande LNG Trains 4 and 5
ABB has been awarded additional orders by Bechtel, extending its scope to deliver integrated automation and electrical solutions for Trains 4 and 5 of the Rio Grande LNG facility in the US.