Skip to main content

2H18 global capacity and capital expenditure outlook for LNG regasification terminals

Published by , Deputy Editor
Tanks and Terminals,


The global LNG regasification industry is expected to increase by 48% during the outlook period 2018-2022. Asia, Middle East and Europe lead globally with the highest regasification capacity additions through new build projects over the next four years. Among countries, India leads regasification capacity additions by 2022, followed by China and Bangladesh. In terms of capex, China, India, and the Philippines lead globally among countries. Among projects, the Al-Zour terminal in Kuwait has the highest new build regasification capacity and capex globally during the outlook period.

Read the article online at: https://www.tanksterminals.com/terminals/20022019/2h18-global-capacity-and-capital-expenditure-outlook-for-lng-regasification-terminals/

You might also like

Hydrocarbon Engineering podcast

Hydrocarbon Engineering Podcast

Peter Davidson, CEO of the Tank Storage Association (TSA), joins us to discuss the essential role that the tank storage sector has to play in ensuring supply security and resilience, as well as in facilitating the energy transition.

Listen for free today »

 

AVTL to develop ammonia terminal in Pipavav

In India, AVTL, will develop a brownfield ammonia terminal at the existing Pipavav location. The terminal will be the first independent ammonia storage terminal in India.

 
 

Embed article link: (copy the HTML code below):