Phase 4 expansion begins at Rubis Terminal Rotterdam
Published by Oliver Kleinschmidt,
Deputy Editor
Tanks and Terminals,
Rubis Terminal Rotterdam has announced the official commencement of its Phase 4 expansion.
Phase 4 has been scheduled to be operational by April 2025 and will feature nine tanks with a combined capacity of 28 000 m3. These tanks have been configured to handle a diverse range of chemicals, biofuels, and circular products, including pyrolysis oils.
In anticipation of the project’s success, Rubis Terminal Rotterdam has extended its gratitude to all involved parties, acknowledging their contributions as the true driving force behind the endeavour. Rubis Terminal will provide updates on the progress of Phase 4 to keep stakeholders informed and engaged throughout the expansion process.
Read the article online at: https://www.tanksterminals.com/terminals/15042024/phase-4-expansion-begins-at-rubis-terminal-rotterdam/
You might also like
Hydrocarbon Engineering Podcast
Peter Davidson, CEO of the Tank Storage Association (TSA), joins us to discuss the essential role that the tank storage sector has to play in ensuring supply security and resilience, as well as in facilitating the energy transition.
Adriatic LNG increase contribution to Italy’s national energy system
Natural gas consumption in Italy saw an increase in the 1H25, and Adriatic LNG’s contribution to the national energy system continued to grow as well.