Skip to main content

Baker Hughes secures additional order for Rio Grande LNG expansion

Published by , Editorial Assistant
Tanks and Terminals,


Baker Hughes has announced an award from Bechtel Energy Inc. to supply primary liquefaction equipment for Train 5 of NextDecade’s Rio Grande LNG Facility in the Port of Brownsville, Texas, US.

The award follows a recent order for Train 4 and is part of a previously established framework agreement covering a variety of Baker Hughes equipment and associated contractual services for Trains 4 - 8.

“Our continued collaboration with Baker Hughes on the Rio Grande LNG project highlights their consistent delivery of industry-leading technology and expertise,” said Bhupesh Thakkar, Bechtel’s General Manager for its LNG business. “We value Baker Hughes' ongoing support as we progress this significant expansion, which will be vital for meeting growing global energy demand.”

“Securing this order for the fifth train of the Rio Grande LNG project underscores the confidence in our proven technology and the dedication of our teams,” added Baker Hughes Chairman and CEO, Lorenzo Simonelli. “We are pleased to extend our collaboration with Bechtel and NextDecade, providing efficient and reliable technology solutions for LNG infrastructure that is critical to sustainable energy development.”

Mirroring the proven technology solution deployed in previous trains, the Train 5 order includes two Frame 7 gas turbines, known for their proven reliability and energy efficiency, and six centrifugal compressors. These advanced solutions, designed to deliver efficiency and lower emissions, will support an additional LNG capacity of approximately 6 million tpy at the facility.

In addition, Baker Hughes is also providing an additional digital solution for Rio Grande’s Trains 1 – 3 through the deployment of CordantTM Asset Health. NextDecade will utilise Cordant to support its equipment monitoring and failure diagnostics for critical rotating equipment, as well as its cloud-based visualisation solution for offline vibration data.

Read the article online at: https://www.tanksterminals.com/terminals/07112025/baker-hughes-secures-additional-order-for-rio-grande-lng-expansion/

You might also like

Hydrocarbon Engineering podcast

Hydrocarbon Engineering Podcast

Peter Davidson, CEO of the Tank Storage Association (TSA), joins us to discuss the essential role that the tank storage sector has to play in ensuring supply security and resilience, as well as in facilitating the energy transition.

Listen for free today »

 
 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

LNG storage news Terminal news North American terminal news