Skip to main content

GTT receives an order for the tank design of two new LNG Carriers 

Published by , Deputy Editor
Tanks and Terminals,


GTT has received an order from a Korean shipyard concerning the tank design of two new 174 000 m3 LNG carriers, on behalf of a European ship-owner. The delivery of the ships is planned for the first semester of 2021.

GTT's membrane containment system Mark III Flex has been selected for the design of the tanks. 

The ship-owner's and shipyard's names are confidential.

Read the article online at: https://www.tanksterminals.com/storage-tanks/10122018/gtt-receives-an-order-for-the-tank-design-of-two-new-lng-carriers/

You might also like

Hydrocarbon Engineering podcast

Hydrocarbon Engineering Podcast

Peter Davidson, CEO of the Tank Storage Association (TSA), joins us to discuss the essential role that the tank storage sector has to play in ensuring supply security and resilience, as well as in facilitating the energy transition.

Listen for free today »

 
 
 

Embed article link: (copy the HTML code below):