Skip to main content

GTT receives new orders

 

Published by
Tanks and Terminals,

Gaztransport & Technigaz (GTT) has received an order from a South Korean shipyard for the design of LNG tanks of a new LNG carrier and a new floating storage and regasification unit (FSRU).

These vessels will be built on behalf of a European shipowner. Their delivery is expected for 1H20.

GTT will design the LNG tanks of both units, each having a capacity of 173 400 m3. The insulation solutions retained are NO96 GW for the LNG carrier and NO96 for the FSRU.

The shipowner and shipyard's names remain confidential.